What Happens After You Say Yes — The Real Timeline From First Conversation to First Day of Construction

Most people come to us knowing what they want. A kitchen that finally works. A home built on their lot, for their life. A remodel that stops being a someday and becomes a plan. What they don’t always know is what happens between that first conversation and the day construction actually starts. That gap — sometimes a few weeks, sometimes a few months — isn’t waiting. It’s working. And what gets done during that time is the reason our projects run the way they do: on budget, on schedule, and without the calls that start with “we ran into a problem.” Here’s what that timeline actually looks like.

What this post covers First conversation → design sessions → architectural drawings → 3D model → selections → ordering → scheduling → breaking ground. Every step, with real timeframes.

The First Conversation

It starts with a call or a message. Sometimes someone’s been watching us for months. Sometimes they just moved to Sioux Falls and found us through a referral. Either way, the first thing I want to know isn’t square footage or budget. It’s how they live. Do they cook together or is one person in the kitchen while the other is somewhere else? Do they work from home? How old are the kids — and how long until they’re gone? What’s the one thing about their current house that drives them crazy every single day? Those answers shape everything that comes next. We’re not applying a template to your life. We’re designing around it.

Design Sessions — The Graph Paper Phase

Once we decide to move forward together, we sit down with graph paper and pencils. Yes, literally. I sketch while we talk. We move walls, shift rooms, try three versions of the same layout until something clicks. Clients often say this is the part they didn’t expect — they thought they’d be handed a plan to react to. Instead, they’re part of building it from the first line. For remodels, this phase involves walking the actual space. I need to see what we’re working with — where the load-bearing walls are, how the light moves through the rooms, what can be opened up and what has to stay. The plan that works on paper has to work in real life first.

From Sketch to Structure — The Architectural Drawing Phase

Once the design direction is set, the hand sketches move into full architectural drawings. This is where the home becomes a real structure — every dimension locked, every detail documented. During this phase, we go back and forth. Adjustments come in, drawings get updated. It’s not unusual to go through several rounds of revisions before the plans are final. That’s not inefficiency — that’s doing it right. A change on paper costs nothing. A change mid-construction costs real money and real time.

See It Before We Build It — 3D Design

Once the drawings are finalized, we build a full 3D model of your home. Not a rendering someone else made — your home, your layout, your selections, modeled so you can see every room before a nail is driven. You see how the natural light moves through the great room at different times of day. You see where the island sits relative to the back door. You catch the things a flat floor plan never shows — the hallway that feels narrow, the window that’s in the wrong spot, the pantry that needs to be three feet wider. Most clients make at least one layout change after seeing the 3D. That’s the point. It is far easier to move a wall in a model than to move it in a frame.

The Selections Process

Before a product is ordered, every material in your home is chosen. This isn’t a quick trip to a showroom. It’s a structured process that covers every category — cabinetry, countertops, tile and backsplash, flooring, fixtures and hardware, lighting, and exterior materials — in order, with purpose.

“An allowance is a placeholder — a guess. We’ve watched them blow budgets on job sites for decades. We won’t do that to our clients.”

We don’t use allowances. An allowance is a placeholder — a guess. It says “we’ll figure that out later,” and “later” is usually when you’re already mid-project and the decisions are no longer optional. We’ve watched allowances blow budgets on job sites across this industry for decades. We won’t do that to our clients. Every single item is chosen from real vendors, priced at real numbers, before we move forward. The selections phase takes time. Sometimes clients need a weekend to think through a flooring choice or revisit a cabinet finish. We don’t rush it. A decision made under pressure is usually the one you regret.

→ Download Our Full Selections Process Guide (PDF)

Products Ordered Before Demo Starts

Once selections are finalized and the budget is locked, products go on order. Cabinets. Windows. Specialty fixtures. Anything with a lead time gets ordered before we schedule demolition. This is non-negotiable for us. The industry is full of stories about kitchens torn apart and sitting open for weeks because cabinets were backordered. We’ve seen it. We don’t repeat it. Demolition doesn’t start until what we need is confirmed, en route, or on-site.

Scheduling — When Construction Actually Starts

With plans finalized, selections made, and products ordered, we can build an accurate construction schedule. Not an estimate — an actual timeline with sequenced trades, delivery windows, and inspection milestones built in. This is also when permits are pulled. In Sioux Falls and surrounding municipalities, permit timelines vary. We factor that in. Nothing gets started before the paperwork is right. The day construction starts, the plan is in place. The budget is locked. The materials are coming. And the same two people you sat across from with graph paper at the beginning are the ones overseeing it through the final walkthrough.

Typical Timeframes

Remodel: 6–10 weeks pre-construction  |  Custom Home: 2–6 months pre-construction
Design + Selections happen before any schedule is set.

So How Long Does This Take?

It depends on the project. A focused remodel can move through this process in six to ten weeks before ground breaks. A custom home — from first conversation through design, selections, and permitting — is typically three to six months of pre-construction work before a shovel hits the ground. That timeline isn’t us being slow. It’s us being thorough. Every week spent planning is a problem that doesn’t happen during construction.

Ready to Not Sure Where to Start??

You don’t have to have everything figured out to call. Most of our clients come to us with questions, not answers. That’s what the first conversation is for. Call or text us at 605-310-4475, or download The Rosewood Way — our free guide that walks you through every step of building, remodeling, or buying with Rosewood. We build one project at a time, and we’d love to talk about yours. — This week we’re celebrating a birthday for Larry and an anniversary for our family and our team. Twenty years married, and we still choose to build things together every single day. We don’t take that lightly — and neither do the clients who trust us with their homes.


Ready to take the next step?

Download the Guide

See every selection category we cover before a single product is ordered. Custom Homes & Remodeling. 

Download the Guide →

Buying or Selling?

Search homes, lots, & acreages or get guidance on selling your current property.

Search All Properties → 

Start the Conversation

Call or text us at 605-310-4475. Sometimes just talking it through is the first step.

Learn More →